After a very productive February, it seems as though I took a step back this past month. While I could blame the Coronavirus COVID-19 pandemic, my supply lines were actually intact. It seems I merely took a break while I calculated next moves.

Progress:

Original Goal for March 31st: Have frame set-up completed in garage stall 3.

Early work the first days of March allowed me to complete the framing (Frame 7 was all that was left). Then ten days elapsed before I gathered myself to laminate the breasthook and stem, which wasn’t as big an ordeal as I had imagined. A lot of time was then spent with false starts on how to proceed. Options:

  • Scarf work:
    • Cutting and scarfing planks for battens, chine and sheer
    • Assemble keel with complicated scarf work
  • Setup
    • Rebuild workshop in different garage stall
    • Built setup jig to start the assembly of the frames together
  • Encapsulation
    • Clean and dust all frames with denatured alcohol
    • Start the encapsulation process 1-2 frames at a time

In the end I half-assed none of it, yet gave all options my full attention. I’ve decided that April we be an encapsulation month, and then hopefully have the setup platform completed (depending on availability of lumber and their hours during the quarantine).

Hours:

  • 12.5 Boat Hours
  • 1.25 Shop Hours
  • 13.75 Total Hours (March 2020)

I only managed to work on the boat on 7 days in March, five of which were on weekend days. My longest stretch was 3 hours this past Sunday (3/29) when I did all of the layout work in the garage, though I would classify that work as goofing off, for the most part, but I did learn some things (such as my 4″ notches for the keel on a few frames are actually slightly narrower, as they don’t accommodate my exactly 6/4 x 4″ keel. I also numbered my frames with an elaborate font. Whee!

The 1.25 “shop” day was goofing around attempting to construct a jig for batten scarf joints.

Expenses:

  • $888.02 on boat
  • $33.36 on workshop
  • $103.38 on consumables
  • $78.74 on shipping/delivery

The Boat expenses were pretty large this month, but I should be in good position going forward:

  • $300.31 on Sapele Mahogany for keel, battens, sheer and chine (including 6/4 stock milled to spec for keel)
  • $283.96 on Epoxy (1.5 gallon of System Three Silver Tip, plus another half-gallon of Poxy-Grip)
  • $265.76 on Silicon Bronze carriage bolts at BoltDepot.com
  • $37.99 on a pair of Wilcox Crittenden boat vents off eBay

Most of the Consumables expenses were materials in preparation for encapsulation (drop cloths, rollers, denatured alcohol) and replacement Famowood for the can that dried all up already.

Making okay progress!